Communications Project Summary

Project:
14th Street Widening
Cable Relocation
Owners/Client:
Alltel
United
Lincoln Electric System
Time Warner Cable
Location:
14th Street & Old Cheney - Lincoln, NE
Description of Work:
Relocation of approximately 2,000 feet of cable and duct.
Method of Construction:
Construction methods include directional boring and trenching. Directional Boring was used to place the cable and reduce the time needed for road closures and restoration. Vacuum Excavation was used to reduce the risk of penetrating existing utility lines prior to construction.
|