Project:
Environmental Remediation Project
Owner/Client:
Bryan LGH Hospital
Lincoln, NE
Harold Kelley
(402) 481-8970
Location:
Lincoln, NE
Description of Work:
Diesel fuel was coming up through the concrete floor in the main hallway from the parking garage to the building of the hospital. Excavation and removal of soils was completed to vent the system.
Method of Construction:
A large amount of people traffic was present during construction so extreme safety was important. General Excavating was required to excavate and remove the soils, as well as install a polyliner. The hallway was rebuilt after finding and repairing fuel lines.

|