Environmental Project Summary
Project:
NE Department of Roads
Lexington, NE
Owner/Client:
Nebraska Department of Roads
Maurice Bonne
1500 Highway 2
Lincoln, NE 68502
(402) 479-4656
Type of Waste / Contaminant:
Free Product and Dissolved Gasoline
Scope of Work:
General Excavating was responsible for the following: installation of one double-cased recovery well, one fuel/water recovery pump, one 1,000 gallon product holding tank, one 100 gallon per minute air stripper, and 250 feet of pipe to the storm sewer. This project presented special construction challenges as a result of a near-surface water table, but the challenge was overcome and the project was completed on time and budget.
|