Environmental Project Summary

Project:
NUCOR Steel NN2 Site Remediation

Client:
Nucor, Bar Mill ­ Norfolk
PO Box 309
Norfolk, NE 68702
Tomas A. Miller, Environmental Manager
(402) 644-0200

Engineer:
HDR Engineering, Inc.

Location:
Norfolk, NE

Description of Work:
The goal of the project was the remediation of lead and cadmium impacted soil and the creation of a synthetic capping system. General Excavating removed a series of railroad tracks, completed the drainage system, prepared the surface and placed the geosynthetic capping system, backfilled, and reinstalled the tracks in less than 25 days to prevent bringing the facility production to a standstill. General Excavating also excavated over 3,000 yards of contaminated material, removed and replaced a 48" storm sewer pipe, and stabilized the soil by incorporating lime into the excavated areas.

*ABC 2004 Excellence in Construction Award Winning Project*