|
Site Utility
Completed Projects
Team Leaders
Communications
Environmental
Trenchless Technology
Hourly Services
|
Site Utility - Completed Projects
Please select from the list of Site Utility projects below to find out more information about each project completed by General Excavating:
Site utility installation
Site utility installation
Site utility installation
Flood Control Rehabilitation
Channel Maintenance Project
Infrastructure Installation
Warehouse/Mixed Use Facility
Stadium Renovation
Hatchery pond drainage structure modification
Make up water supply and blowdown
Installation of draining and pumping system to eliminate flooding
Excavation for cement dome storage facility
Replacement of water main ranging in size from 6" 10". Over 17,000 LF of pipe was replaced throughout the city
Installation of a storm sewer drain lines, sanitary sewer and water lines
Installation of a storm sewer collection and pumping system to eliminate extensive flooding in a portion of the City
Traditional trenching and digging
Traditional trenching and digging
Standard trenching and backfilling
Desert/Nocturnal Dome
New Sewer Lift Station and Force Main
Large Retaining Wall
Electric Vault
New Sewer Line
New Sewer Line ‚ Pace Boning
Wastewater Treatment Plant Improvements
Master Service Agreement for Construction Services
Memorial Stadium Sewer Upgrade
Utility Installation in Conjunction with Street Widening
|