Site Utility Project Summary
Project:
Installation of new duct bank, manholes, and switchgears and cabinets, in conjunction with street widening.
Owner/Client:
Omaha Public Power District (OPPD)
444 South 16th Mall
Omaha, NE 68102-2247
Contact:
Joel Lenhart
Project Manager
OPPD
(402) 636-3359
Work Description:
Installation of 2W x 3H x 5-inch duct bank, 6 feet deep, 4000 feet in length to coincide with street widening, Dodge Street, 152nd to 168th. Installation of 13 manholes, with switchgears and cabinets. Intensive schedule coordination with paving contractor.
Method of Construction:
Open cut and install concrete encased duct lines and pre-cast manholes.
Conclusion:
Street widening initiated in 1995. Project completed in September, 1997. The project was completed within the general contractors schedule and budget. It was completed without any accidents or safety problems. |